Brick Paver Installation & Edging



Staging of material

The majority of paver jobs will vary depending upon access, website conditions, job size and of course, the weather condition. These situations can have a total impact on your task from a timing stand point. Cautious factor to consider must be taken to identify the time to start the paver installation. Always aim to avoid any traffic or decrease on the prepared locations.

The foreman or job supervisor ought to constantly have the materials (sand/ pavers) distributed around the task site for simple and effective installations. Paver pallets/bundles need to be placed in a way not to interfere with the paver installation. The proper pallet/bundle placement can make the real task installation simpler and quicker by lowering the overall labor of managing the material.

Brick paver patterns

Pavers can be put in several patterns depending on their shape. Each paver shape will usually have several different hatch patterns that are supplied by the manufacturer.

The laying pattern and shape of the paver is really critical to the performance of the application. Specialists need to consider the traffic weight loads on their paver projects. 90 or 45 degree herringbone patterns are suggested in all street and driveway applications, as these patterns will supply the optimum load support required and will withstand creeping from the turning of tires and braking or beginning of vehicular traffic. In a lot of applications around the world, it has been revealed that pavers laid in a herringbone pattern have actually performed properly.

Pavers that are 60 mm (2 - 3/8 in) thickness are suitable for pedestrian applications. Pavers that are going to be utilized in business or commercial applications must be 80 mm (3 - 1/8 in) in thickness.

Reference/starting point for brick paver installation

There are a number of conditions that identify the beginning point of a paver project.

When starting to set up pavers it is best to snap a real straight chalk line on the surface of the bed linen sand or pull a true straight string line above the surface of the bed linen sand at the ended up elevation of the pavers This will help as a guide for maintaining straight joint lines and will also permit the installer to make changes in the alignment of the pavers.

Buildings and concrete suppressing are usually not straight and need to not be used for establishing straight joint lines. Using string lines is vital to figure out the true straightness of the edge as well. As the paver installation advances, the string lines will assist lessen the requirement for little trim pieces.

Joint width in between pavers should be between 1/16 and 3/16 in (2 and 5 mm ). There are some pavers with spacer bars on their sides. These will maintain a minimum joint width and enable the bedding and jointing sand to go into in between each paver. Pavers with spacer bars are normally not laid in snug versus each other given that a string line will provide consistent joint spacing.

Installation of brick pavers.

One of the most extensively utilized approaches for the installation of pavers is hand installation of each paver. It is best to set up a single row of pavers along one of the real straight lines that you have actually pulled or above the bed linen sand. The finest approach is to position a paver versus another one and let it move down into the bedding sand.

When installing pavers on a steep grade, they should be installed at the base of the grade going uphill. This will prevent the pavers from sneaking as they are being laid.

On big business and commercial applications, hand laying pavers would not be cost effective due to the labor strength. The very best method for installing pavers on large projects is to install them mechanically. The use of a mechanical laying machine can install approximately 6000 - 7000 sq ft a day. There are a couple products a specialist need to think about prior to setting up pavers mechanically:

1.) Mechanical installers are just capable of installing pavers in certain patterns.

2.) The contractor must make sure that the producer can manufacturing and bundling pavers in the desired pattern on the pallets for simple mechanical installation.

3.) Specialists might encounter a color blending circumstance coming off the packages of pavers Poor color mixing might lead to an irregular looking installation. Most manufacturers are consistent with color blending on each bundle of pavers, but it is the professional's obligation to make sure correct mixing in the field.

Cutting procedures for brick pavers.

Contractors normally have 2 methods of cutting pavers. Pavers are cut either by 1). A double bladed guillotine or by 2). A gas powered cut off saw or brick saw which is geared up with a diamond blade. The diamond blade cut-off saw or brick saw will supply a much cleaner and more precise cut. Most brick saws will have a hose pipe accessory on them which will permit the operator to cut the pavers damp. When cutting pavers damp, it will assist lessen dust and will extend the diamond blades life also. The operator of the brick saw ought to always cut the pavers away from the surface of the paver field when cutting wet, due to the fact that the pavers will produce a slurry that will stain the paver surface. Pavers that are cut should not fit tight, sufficient spacing should be available for jointing sand.

The brick saw operator ought to always use the correct defense that is required for operating a saw, such as eye, ear, respiratory and hand protection ).

Edging types

Edge restraints play a significant function in the general success of an interlocking pavement installation Edging restraints get rid of lateral movement of the pavers and hold the pavers tightly together. Especially at the external border of the paver application, without an edging restraint, your job is guaranteed to fail over time.

Generally manufactured edge restraints are the most frequently used by contractors. Made edging restraints can vary from, plastic edging, steel and aluminum, woods or precast concrete and stone.

Edging installation.

This could result in the migration of the bed linen South Florida Pavers sand and eventual lateral motion of the pavers. If there is a possibility of losing bedding sand in between the pavers and the edge restraint, then geo textile material is recommended. When a space between the pavers and the edging goes beyond 3/8" (10mm), then the space needs to be filled with cut pavers.

Compaction of brick pavers.

After installation, the pavers need to be compressed. The entire location that is to be compacted should be swept tidy of any foreign objects and particles that can cause scuffing or scratching on the surface of the pavers.

In addition, it is important that the very first compaction takes place prior to any jointing sand has actually been applied to the pavers. If jointing sand is used to the pavers before compaction takes location, this can cause a bridging problem and will not permit the joints to be completely filled with jointing sand. This can likewise prevent the pavers from being appropriately set into the bed linen sand.

When compacting the pavers, it is advised that you make at least 2 passes in various directions throughout the pavers. This will allow the pavers to be correctly embeded in the bedding sand and will require the bed linen sand up into the joints from the bottom of the pavers.

The compaction of the pavers is very vital to the final performance of the pavers. Failure to do correct compaction can result in contortions and pavement failure with time.


Paver pallets/bundles ought to be put in a manner not to interfere with the paver installation. One of the most extensively used techniques for the installation of pavers is hand installation of each paver. The operator of the brick saw need to always cut the pavers away from the surface of the paver field when cutting damp, due to the fact that the pavers will produce a slurry that will stain the paver surface area. Edging restraints eliminate lateral movement of the pavers and hold the pavers securely together. When a space between the pavers and the edging surpasses 3/8" (10mm), then the area should be filled with cut pavers.